In development. This is on the roadmap and not available yet. The guide is here so it is ready the day it ships.
Integrations & API

Sched Integration — Sync Your Schedule

Push your lineup and session schedule to Sched, so multi-track events keep one source of truth.

3 min readUpdated 2026-07-29

Festivals and conferences that run parallel tracks usually end up keeping the schedule in two places — once inside the system where tickets are sold, and again inside whatever tool attendees actually browse to plan their day between stages. Every time a session moves, a teacher drops out, or a room changes, someone has to update both places by hand, and the two versions drift apart the moment someone forgets. BrightStar's Sched integration closes that gap. Once it's connected, a change you make on BrightStar reaches Sched without a second pass, so the lineup attendees are looking at on their phones matches what your team is actually running.

What information moves from BrightStar to Sched

BrightStar sends over the pieces that make a multi-track schedule usable: each session with its start and end time, which track or stage it belongs to, the presenting artists or teachers along with their bios and photos, and the venue and room. This is the information an attendee actually needs to decide what to walk to next — not just a session title, but where it is, when it starts, and who's leading it. Sending bios and photos along with the session means Sched can show attendees a real picture of who they're about to sit with, which matters at a kirtan or teaching track where the draw is often the person, not just the topic.

Setting it up

Setting it up:

  1. 1Open Dashboard → Integrations and choose Sched
  2. 2Authorise with your Sched account
  3. 3Pick which event maps to which Sched conference
  4. 4Run the first sync and review before publishing on Sched

What happens when you change a session after the first sync

Sync isn't a one-time push. Once your event is connected, time changes propagate to Sched when you save them on BrightStar, so if a session slips because the room before it ran long, you fix it in one place and it's fixed everywhere. Cancellations work differently on purpose: a cancelled session is marked cancelled on Sched rather than silently removed. If an attendee saved that session to their personal schedule, a session that vanishes without explanation looks like a bug or a missed alarm. A session marked cancelled tells them plainly what happened, so they can go find something else in that slot instead of showing up to an empty room.

Sched stays the attendee-facing schedule — the place people browse and build their personal day. BrightStar remains the source of truth for ticketing and access. Nothing about who gets through the door, or how many people a session can hold, depends on the sync, so a sync delay or a mapping mistake never turns into an entry problem.

Why ticketing and the schedule stay separate systems

It would be simpler, on paper, for one system to run both the public schedule and the door. BrightStar keeps them apart deliberately. Sched is built for browsing a lineup, not for checking someone in or enforcing capacity, and asking it to do both would mean your entry logic depends on a second product's uptime and syncing behavior. By keeping BrightStar as the only place that governs tickets and access, a sync hiccup on the Sched side stays a display issue — an attendee might see a slightly stale session list for a moment — rather than a door issue. That separation is also why the setup asks you to review the first sync before publishing: it's the one point where a mapping mistake could show the wrong sessions to attendees, and reviewing before it goes live catches that before anyone sees it.

Common questions

Does BrightStar integrate with Sched?

Yes. BrightStar's Sched integration pushes your lineup and session schedule to Sched, so festivals and conferences with parallel tracks do not have to maintain the schedule twice. A change made on BrightStar reaches Sched without a second pass.

Read more

This matters most for events running several stages or tracks at once, where a single missed update means an attendee walks to a room that's no longer hosting what they expected. Because the connection is ongoing rather than a one-time export, the two schedules keep matching each other as your event evolves, not just on the day you first set it up.

What information does BrightStar send to Sched?

BrightStar sends sessions with their start and end times, track or stage assignment, presenting artists and teachers along with their bios and photos, and the venue and room. After the initial sync, time changes propagate to Sched when you save them.

Read more

Sending the full picture — not just a title and a time slot — is what lets Sched work as a real planning tool for attendees rather than a bare list. Seeing a teacher's bio and photo next to a session helps someone choose between two overlapping offerings on a busy multi-track day, which is usually the whole reason they're checking the schedule in the first place.

How do I connect my event to Sched?

Open Dashboard, then Integrations, and choose Sched. Authorise with your Sched account, pick which BrightStar event maps to which Sched conference, then run the first sync and review it before publishing on Sched.

Read more

You'll need an existing Sched account, since the authorisation step connects BrightStar to it rather than creating one for you. The mapping step, where you choose which BrightStar event corresponds to which Sched conference, is worth double-checking if you run more than one event, since it determines where all the synced sessions land.

What happens to a session on Sched if I cancel it in BrightStar?

A cancelled session is marked cancelled on Sched rather than silently removed. That way attendees who saved the session to their personal schedule can still see what happened to it.

Read more

The alternative — a session quietly disappearing — is worse for attendees than it sounds, because someone who built their day around it gets no explanation and no chance to plan around the gap. Marking it cancelled instead of deleting it keeps the record honest and gives attendees the information they need to pick something else.

Does the Sched integration affect ticketing or entry?

No. Sched stays the attendee-facing schedule while BrightStar remains the source of truth for ticketing and access. Nothing about entry or capacity depends on the sync.

Read more

That separation is intentional: Sched is where people browse the lineup, not where anyone gets checked in or where capacity is enforced. It means a delayed sync or a mismatched conference mapping can, at worst, leave the public schedule briefly out of date — it can never affect who is allowed through the door or how many people a session can hold.

Ready to get started?

Create your first event on EveryEvent Rio de Janeiro — it’s free.